November 22Nov 22 comment_620 I encountered an issue with reinforcement installation on a construction site and there was a discussion regarding the following detail:In first drawing, the top reinforcement mesh is placed on top of the U bars, while in another drawing it is below the U bars, meaning the U bars hold both the top and bottom mesh.Is it critical how this detail is executed?Can the top mesh be placed on top of the U bars, or does it need to be under the U bars?Is it sufficient to ensure the proper overlap of bars only?The design standard being followed is Eurocode 2 (EC2). Report